Terminal for the reloading of grain and oil seed cargo at the Danube river port of Vukovar. It consisted of a 205m long docking facility that is able to berth river ships and barges with a loading capacity of up to 3 000t and a length of 120m. We were briefed to prepare detailed designs and workshop drawings for multiple constructions at the terminal. We also supervised the fabrication of the steel structures.
Terminal for the reloading of grain and oil seed cargo at the Danube river port of Vukovar. It consisted of a 205m long docking facility that is able to berth river ships and barges with a loading capacity of up to 3 000t and a length of 120m. We were briefed to prepare detailed designs and workshop drawings for multiple constructions at the terminal. We also supervised the fabrication of the steel structures.